Friday, July 28, 2017

Breaking News
   Kovind takes oath as 14th president   Syrian rebel aid programme was ‘dangerous and wasteful’: Trump   62.3 lakh tourists visited Goa in 2016-2017   CM assures he will streamline recruitment process for jobs   Smartphone demand won’t be impacted by GST: Survey   Yatrik Travels organising various tours   Jaitley: RBI processing old notes to verify numerical accuracy   Google CEO Pichai joins Alphabet BoDs   No service tax on online rail tickets till Dec 31   Black money: India to gain access to Swiss bank info from Sept 2019   Cash curbs paralyse ops in co-op societies   Margao business, markets reel under liquidity crunch   Customers, bankers kept on toes in Mapusa   Long queues at banks on Day 1; cash crunch hits State   Anger And Scramble To Stash Cash In Black Money Squeeze: Foreign Media   After PM Modi Speech, Hawala (Money-Laundering) Spiked, Triggering Raids   Defence Minister Parrikar\'s Nuclear Remark Stressed As \'Personal Opinion   \'If You Succeed, The Country Succeeds\': Obama Tells Trump During Meet

Sections

Goa

Designed to attract, Mandovi bridge gets its first cables

21st April 2017, 07:22 Hrs

Contractor of the third bridge across River Mandovi, Larsen and Toubro, has begun work of stretching cables on the main bridge structure with the first pair of cables now visible from the top of the tower erected in the river waters on Panaji-side.



the goan I network
PANAJI      
 
Five cables will be stretched on either side of each of the four towers grounded in the river water.  
The cables, which form the main design attraction of the under-construction second largest cable-stayed bridge in India, will run parallel to each other and ultimately form a harp-like pattern supporting the 150 mts span over Mandovi waters, of the total 660 mts-long bridge.   
Segments 3, 5, 9, 11 and 13 have been marked for stretching and grounding cables on either side of towers.   
The pre-stressed cables running stitching spans measuring 50 mts and the cables from the pylons together comprise the extradosed structure of the bridge. The cable-stayed tech is the latest, longer-lasting tech with aesthetic values in creation of the bridge.
comments powered by Disqus